1000kVA 800kW 1100kva Cumins Heavy Duty Diesel Generator Set V12 38L IP23 196g/kWh for Data Center Construction Oil Field Mine
Price varies depending on material, logo, quantity and customization requirements.
Introduction
| Frequency | 50/60HZ | Rated Voltage | 110 V, 220 V, 230 V, 240 V, 380 V, 400 V, 480V, 400/230V |
| Engine Brand | Weichai, Yuchai, Shangchai, Cumins, Perkkins, Ricardo | Type | Silent Type, Super Silent Type, Open Frame, Canopy Type |
| Cooling System Type | Water Cooling System | Rated Current | 1440A |
| Protection | Overload Protection, Low Oil Shutdown, Automatic Voltage Regulation, Under-Voltage Protection | Speed | 1500/1800RMP |
| Starting System | 24V DC Electric Start, Auto Start, Recoil Start, Remote Start | Options | Remote Control, ATS, Battery Charger, Mobile Trailer, Soundproof Canopy, Rainproof Canopy |
| Efficiency | 60%, 65%, 70%, 76%, 0.8, 0.85, 0.86, 88%, 0.9, 91%, 0.93, 95%, 99%, 100% | Weight | 8000KG |
| Parallel Operation Capability | Auto Sync, 32+ | Product Name | 1000kVA 800kW Cumins Heavy Duty Diesel Generator Set V12 |
| Engine | WEICHAI YUCHAI RICARDO PERKKINS CUMINS | Certification | CE ISO |
| production time | 2-10 days depends on the quantity | Engine Cylinder | 4/6/8/10/12 |
| Cooling method | Water-cooling System | Starting system | DC24V electric start |
| intake way | naturally/tur | Controller | Smartgen HGM6110/ DeepSea/ Harsen |
We are a professional manufacturer and supplier, dedicated to maintaining consistent quality and establishing long-term partnerships with clients worldwide.
Our mission is to provide high-quality products and reliable service. We are committed to offering the following advantages:
- Stable production system ensuring consistent quality, dependable supply, and standardized manufacturing management;
- Strict quality control covering material selection, processing, surface finishing, and final packaging;
- Variety of products and specifications to meet diverse project requirements and application scenarios;
- OEM & customization support based on drawings, samples, or specific technical requirements;
- Flexible packaging solutions to ensure safe handling and transportation of products;
- Continuous improvement in products and services to better support customers in different markets.
If you are interested in our products, please feel free to contact us. We look forward to establishing long-term and mutually beneficial cooperation with you.